Review of options for an additional runway and site analysis for a new ATC tower and runway CFR stations at Abuja airport
Year(s): 2017-2018
Location: Abuja, Nigeria
Scope of Services rendered:
Analysis of three configuration options for a future second runway including
- The preparation of a 20-year forecast for passenger and cargo demand, aircraft movements and the aircraft mix
- An analysis of the runway usability and of the runway capacities
- Turbulence and windshear considerations,
- An analysis of the obstacle situation (OLS),
- The evaluation of operational aspects and options for the development of the airport’s landside infrastructure
- A study for the siting of a new tower and of CFR stations in the single and two-runway airport (subject to applicable standards).