Review of options for an additional runway and site analysis for a new ATC tower and runway CFR stations at Abuja airport

Review of options for an additional runway and site analysis for a new ATC tower and runway CFR stations at Abuja airport

Year(s): 2017-2018

Location: Abuja, Nigeria

Scope of Services rendered:

Analysis of three configuration options for a future second runway including

  • The preparation of a 20-year forecast for passenger and cargo demand, aircraft movements and the aircraft mix
  • An analysis of the runway usability and of the runway capacities
  • Turbulence and windshear considerations,
  • An analysis of the obstacle situation (OLS),
  • The evaluation of operational aspects and options for the development of the airport’s landside infrastructure
  • A study for the siting of a new tower and of CFR stations in the single and two-runway airport (subject to applicable standards).